From: route@monster.com
Sent: Tuesday, December 01, 2015 2:35 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: Primavera P6
This resume has been forwarded to
you at the request of Monster User xapeix01
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Ted L Lykins 537 Adams Road ◆ Beaver, Ohio 45613 ◆ (740) 418-0789 ◆tedlykins@hotmail.com Objective Project Controls
position using Primavera software as a scheduling tool, to be able to
contribute my skills and to be a part of a focused team with specific goals,
while having an opportunity for growth. Profile I have worked in
Project Controls for major companies in the power, nuclear and aerospace
industries, also, at a Department of Energy site in the nuclear industry. My
17-years of experience have helped these companies meet deadlines in a timely
manner. I am a motivated
professional who succeeds in Project Controls. I am a professional, but yet
personable, easily approachable and able to take the lead. I have
expectations of honesty and integrity, not only for myself, but also for whom
I work with. Skills Summary
Professional
Experience Palo Verde Nuclear Generation station (APS) – Tonopah, AZ (G.D. Barri & Associates) Senior
Scheduler, 4/2012 to Present ◆ Building project
schedules in P6.8.2 with resources, cost, logic, coding and WBS. ◆ Serving
as PMO Department P6 Administrator to ensure P6 needs are met for Projects
group. ◆ Working
closely with Project Managers in developing schedules for both Capitol and
O&M projects. ◆ Working
with contractors to build and review schedules. ◆ Lead
Scheduler of up to 6 other Schedulers. ◆ Responsible
for training new Schedulers and ensuring they have computer access as needed. ◆ Responsible
for setting up P6 template to be used when creating new project schedules. DEPARTMENT OF ENERGY – Piketon, OH (Tetra Tech HEI) Senior
Project Controls Specialist, 4/2010 to 3/2012 ◆ Reviewed
contractor schedules for logic, budget, coding, WBS and critical path
received by DOE. ◆ Resource-loaded
craft schedules for demolition, decommissioning, packaging and transporting
of waste. ◆ Worked
closely with Project Managers to develop schedules for task at hand. ◆ Performed
technical evaluations for contract proposals received by DOE. ◆ Prepared
a schedule for Decontamination and Decommissioning Project for the DOE
Federal Baseline. ◆ Worked
with the Environmental Management Primavera Initiative (EMPI) Project Team to
implement the Enterprise Project Controls System (EPCS) at the Portsmouth
site. DEPARTMENT OF ENERGY – Cincinnati, OH (Project services group) Cost
Analyst, 11/2009 to 4/2010 ◆ Performed
Cost Analysis for Contract Proposals received by DOE. ◆ Reviewed
the structure, definition and associated cost for the Cost Elements. ◆ Comparison/evaluation
of competing proposals. ◆ Report
writing to document recommendation/findings to the Contracting Officer. Urenco USA – Eunice, NM (tRIAD Project Management Services) Construction
Scheduler, 9/2009 to 11/2009 ◆ Lead
Scheduler for a Centrifuge Facility Construction Project using P6.2.1. ◆ Updated
schedules daily with Engineering, Procurement and Construction status. ◆ Responsible
for overseeing other schedulers work and their day to day activity. ◆ Worked
closely with several managers to develop breakout schedules to better define
the work scope. ◆ Reviewed
Subcontractors Schedules. COLUMBUS REGIONAL AIRPORT AUTHORITY – Columbus, OH (Robert Half INTERnational) Project
Controls Analyst, 4/2009 to 9/2009 ◆ Created
a Project Controls Program for construction, customer care improvements and
environmentally conscious projects at three airports using P6.2.1. ◆ Implemented
Earned Value Management System. ◆ Reviewed
Subcontractors Schedules. ◆ Trained
Project and Construction Managers on Contract Manager. ◆ Created
a Training Program for P6.2.1. fluor enterprises INC – Greenville, SC (brillig systems) – Greenville, SC Located
at the USEC site - Piketon, OH Project
Planner/Scheduler, 6/2008 to 2/2009 ◆ Prepared
a project schedule for a Centrifuge Facility Construction for USEC using P3. ◆ Updated
schedules weekly with Engineering, Procurement and Construction status. ◆ Resource
loaded craft schedules for demolition and installation. ◆ Worked
closely with Construction Manager to develop Construction Work Packages (CWP)
for task at hand. Benham constructors (SAIC)–
Oklahoma City, OK (aerotek corp) Located
at the Plum Brook site - Sandusky, OH Project
Scheduler, 10/2007 to 6/2008 ◆ Developed/maintained
an integrated schedule for a Vibro-Acoustic Project for NASA using P3, P6.2.1
and Digger. ◆ Used
EVMS reporting system to include resource/cost loading and a WBS system. ◆ Interfaced
with Control Account Managers/subcontractors to ensure updates of their
activities and performed Schedule Analysis each week. ◆ Reviewed
subcontractors proposal schedules. ◆ Created/Updated
Engineering, Purchasing and Construction schedules. ◆ Performed
weekly schedule updates. ◆ Worked
closely with client to ensure deliverables met their ongoing needs. cdi corporation – South Charleston, WV Project
Scheduler, 6/2007 to 10/2007 ◆ Built/maintained
an integrated schedule for a Reverse Osmosis Membrane Manufacturing facility
Project for Filmtec/DOW Chemical Company. ◆ Performed
weekly updates with Engineering, Purchasing and Construction teams to status
schedules. ◆ Converted
the project schedule from Microsoft Project to P3, while mentoring the client
on P3. ◆ Interfaced
with subcontractors to ensure updates of all sub-projects and analyzed
schedule variances using Digger. ◆ Prepared
weekly status reports for the client. ◆ Developed
user friendly layouts for the client’s needs. american electric power - aep – Columbus, OH Project
Scheduler, 11/2003 to 6/2007 ◆ Built/maintained
schedules for environmental projects: FGD (Flue Gas Desulfurization),
PRB (Powder River Blend) and SCR (Selective Catalytic Reduction) using P3and
served as Schedule Integrator. ◆ Performed
weekly Schedule/Cost Analysis for assessments/reports. ◆ Reported
progress through SPI/CPI curves and drawdown curves using MS Word, Excel and
Lotus. ◆ Resource/Cost
loaded schedules. ◆ Reviewed
proposal schedules for subcontractors. ◆ Worked
at both the corporate office and construction sites to update progress for
Engineering, Permitting, Purchasing, Construction and Startup. ◆ Interfaced
with other schedulers to ensure updates of all sub-projects and trained them
accordingly. ◆ Worked
closely with Project Managers/Engineers and Construction Managers through
schedule analysis, cost analysis, problem resolution and schedule forecast. ◆ Developed
punch list, milestone and any miscellaneous schedules as needed. riley power inc – Worcester, MA (CDI Corporation) Located
at the AEP site - Columbus, OH Project
Coordinator, 1/2001 to 10/2003 ◆ Maintained
multiple Engineering/Procurement schedules for SCR (Selective Catalytic
Reduction) Projects for American Electric Power using P3. ◆ Interfaced
with client staff Project Managers, Engineers and Schedulers on a regular
basis to maintain and update the schedule. ◆ Used
Costpoint and Impromptu to compile the Monthly Status Reports for the clients
review. united states enrichment corporation – Piketon, OH Senior
Integrated Planning and Scheduling Coordinator, 5/1997 to 7/2000 ◆ Using
P3, Work Order task were imported daily from CMMS and scheduled based upon
need and urgency. ◆ Responsible
for ensuring preventative maintenance and surveillance work was scheduled
properly to remain compliant with plant policies and procedures, as well as
the Nuclear Regulatory Commission. ◆ Correlated
schedules for a Decontamination Building Recovery Project of several chemical
systems to be restored in a very delicate pattern with limited maintenance
resources. ◆ A
project for Decontamination of Customer Product Containers to ensure the
companies target shipment of product. ◆ Generated
inventory type schedules of radioactive material shipped into the facility,
as well as coordinated the shipment/transfer, while remaining in compliance
with the facilities guidelines. ◆ Held
DOE ‘L’ Clearance. Senior
Health Physics Technician, 9/1989 to 5/1997 ◆ Surveyed
and assessed for radiation and contamination of equipment and areas for
radiological workers and their safety. ◆ Worked
closely with a variety of workers and managers in the nuclear industry; not
only to protect them, but also the environment and production equipment. ◆ Surveyed
equipment and work areas to obtain proper posting, labeling and tagging of
radiological equipment and areas. ◆ Worked to ensure compliance with Nuclear Regulatory
Commission and plant procedures. ◆ Held DOE ‘Q’
Clearance. ◆ Educated workers of how to read postings and labels,
and about radiation and contamination protection. Education shawnee state university – PORTSMOUTH, oh Associates
Degree Humanities/Fine Arts, 1988 shawnee state university – portsmouth, oh Associates
Degree –
Mathematics/Science, 1988 Page
| 1 |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|