Ted Lykins 

Last updated:  10/07/14

Job Title:  no specified

Company:  no specified

Rating:  Not Rated

Screening score:  no specified

Status:  Resume Received


Beaver, OH  45613
US

Mobile: 740-418-0789   
tedlykins@hotmail.com
Contact Preference:  Mobile Phone

Quick View Links:

Resume Section

Summary Section

 

 

RESUME

  

Resume Headline: Ted Lykins - Senior Project Controls Specialist

Resume Value: 2hcynfwp443m59jy   

  

 

 

Ted L Lykins

537 Adams Road Beaver, Ohio 45613 (740) 418-0789 tedlykins@hotmail.com

Objective

Project Controls position using Primavera software as a scheduling tool, to be able to contribute my skills and to be a part of a focused team with specific goals, while having an opportunity for growth.

Profile

I have worked in Project Controls for major companies in the power, nuclear and aerospace industries, also, at a Department of Energy site in the nuclear industry. My 17-years of experience have helped these companies meet deadlines in a timely manner.

I am a motivated professional who succeeds in Project Controls. I am a professional, but yet personable, easily approachable and able to take the lead. I have expectations of honesty and integrity, not only for myself, but also for whom I work with.

Skills Summary

       Primavera P6.8.2

       Primavera P3

       Primavera Claim Digger

       Primavera Contract Manager

       Cobra

       Schedule/Cost Analysis

       Microsoft Project

       Microsoft Word

       Microsoft Excel

       Power Point

       Report Writing

       Earned Value

       Cost/Schedule Proposals

       Scheduling

       Schedule Integrator

       Resource/Cost Loading

       Baselining

       Training/Mentoring

Professional Experience

 

Palo Verde Nuclear Generation station (APS)Tonopah, AZ

(G.D. Barri & Associates)

Senior Scheduler, 4/2012 to Present

        Building project schedules in P6.8.2 with resources, cost, logic, coding and WBS.

      Serving as PMO Department P6 Administrator to ensure P6 needs are met for Projects group.

      Working closely with Project Managers in developing schedules for both Capitol and O&M projects.

      Working with contractors to build and review schedules.

      Lead Scheduler of up to 6 other Schedulers.

      Responsible for training new Schedulers and ensuring they have computer access as needed.

      Responsible for setting up P6 template to be used when creating new project schedules.

 

DEPARTMENT OF ENERGYPiketon, OH

(Tetra Tech HEI)

Senior Project Controls Specialist, 4/2010 to 3/2012

      Reviewed contractor schedules for logic, budget, coding, WBS and critical path received by DOE.

      Resource-loaded craft schedules for demolition, decommissioning, packaging and transporting of waste.

      Worked closely with Project Managers to develop schedules for task at hand.

      Performed technical evaluations for contract proposals received by DOE.

      Prepared a schedule for Decontamination and Decommissioning Project for the DOE Federal Baseline.

      Worked with the Environmental Management Primavera Initiative (EMPI) Project Team to implement the Enterprise Project Controls System (EPCS) at the Portsmouth site.

 

DEPARTMENT OF ENERGYCincinnati, OH

(Project services group)

Cost Analyst, 11/2009 to 4/2010

      Performed Cost Analysis for Contract Proposals received by DOE.

      Reviewed the structure, definition and associated cost for the Cost Elements.

      Comparison/evaluation of competing proposals.

      Report writing to document recommendation/findings to the Contracting Officer.

 

Urenco USAEunice, NM

(tRIAD Project Management Services)

Construction Scheduler, 9/2009 to 11/2009

      Lead Scheduler for a Centrifuge Facility Construction Project using P6.2.1.

      Updated schedules daily with Engineering, Procurement and Construction status.

      Responsible for overseeing other schedulers work and their day to day activity.

      Worked closely with several managers to develop breakout schedules to better define the work scope.

      Reviewed Subcontractors Schedules.

 

COLUMBUS REGIONAL AIRPORT AUTHORITYColumbus, OH

(Robert Half INTERnational)

Project Controls Analyst, 4/2009 to 9/2009

      Created a Project Controls Program for construction, customer care improvements and environmentally conscious projects at three airports using P6.2.1.

      Implemented Earned Value Management System.

      Reviewed Subcontractors Schedules.

      Trained Project and Construction Managers on Contract Manager.

      Created a Training Program for P6.2.1.

 

fluor enterprises INC Greenville, SC

(brillig systems) Greenville, SC

Located at the USEC site - Piketon, OH

Project Planner/Scheduler, 6/2008 to 2/2009

      Prepared a project schedule for a Centrifuge Facility Construction for USEC using P3.

      Updated schedules weekly with Engineering, Procurement and Construction status.

      Resource loaded craft schedules for demolition and installation.

      Worked closely with Construction Manager to develop Construction Work Packages (CWP) for task at hand.

 

Benham constructors (SAIC)Oklahoma City, OK

(aerotek corp)

Located at the Plum Brook site - Sandusky, OH

Project Scheduler, 10/2007 to 6/2008

      Developed/maintained an integrated schedule for a Vibro-Acoustic Project for NASA using P3, P6.2.1 and Digger.

      Used EVMS reporting system to include resource/cost loading and a WBS system.

      Interfaced with Control Account Managers/subcontractors to ensure updates of their activities and performed Schedule Analysis each week.

      Reviewed subcontractors proposal schedules.

      Created/Updated Engineering, Purchasing and Construction schedules.

      Performed weekly schedule updates.

      Worked closely with client to ensure deliverables met their ongoing needs.

 

cdi corporation South Charleston, WV

Project Scheduler, 6/2007 to 10/2007

      Built/maintained an integrated schedule for a Reverse Osmosis Membrane Manufacturing facility Project for Filmtec/DOW Chemical Company.

      Performed weekly updates with Engineering, Purchasing and Construction teams to status schedules.

      Converted the project schedule from Microsoft Project to P3, while mentoring the client on P3.

      Interfaced with subcontractors to ensure updates of all sub-projects and analyzed schedule variances using Digger.

      Prepared weekly status reports for the client.

      Developed user friendly layouts for the clients needs.

 

american electric power - aep Columbus, OH

Project Scheduler, 11/2003 to 6/2007

      Built/maintained schedules for environmental projects:  FGD (Flue Gas Desulfurization), PRB (Powder River Blend) and SCR (Selective Catalytic Reduction) using P3and served as Schedule Integrator.

      Performed weekly Schedule/Cost Analysis for assessments/reports.

      Reported progress through SPI/CPI curves and drawdown curves using MS Word, Excel and Lotus.

      Resource/Cost loaded schedules.

      Reviewed proposal schedules for subcontractors.

      Worked at both the corporate office and construction sites to update progress for Engineering, Permitting, Purchasing, Construction and Startup.

      Interfaced with other schedulers to ensure updates of all sub-projects and trained them accordingly.

      Worked closely with Project Managers/Engineers and Construction Managers through schedule analysis, cost analysis, problem resolution and schedule forecast.

      Developed punch list, milestone and any miscellaneous schedules as needed.

 

riley power inc Worcester, MA

(CDI Corporation)

Located at the AEP site - Columbus, OH

Project Coordinator, 1/2001 to 10/2003

      Maintained multiple Engineering/Procurement schedules for SCR (Selective Catalytic Reduction) Projects for American Electric Power using P3.

      Interfaced with client staff Project Managers, Engineers and Schedulers on a regular basis to maintain and update the schedule. 

      Used Costpoint and Impromptu to compile the Monthly Status Reports for the clients review.

 

united states enrichment corporation Piketon, OH

Senior Integrated Planning and Scheduling Coordinator, 5/1997 to 7/2000

      Using P3, Work Order task were imported daily from CMMS and scheduled based upon need and urgency. 

      Responsible for ensuring preventative maintenance and surveillance work was scheduled properly to remain compliant with plant policies and procedures, as well as the Nuclear Regulatory Commission.

      Correlated schedules for a Decontamination Building Recovery Project of several chemical systems to be restored in a very delicate pattern with limited maintenance resources.

      A project for Decontamination of Customer Product Containers to ensure the companies target shipment of product.

      Generated inventory type schedules of radioactive material shipped into the facility, as well as coordinated the shipment/transfer, while remaining in compliance with the facilities guidelines.

      Held DOE LClearance.

 

Senior Health Physics Technician, 9/1989 to 5/1997

      Surveyed and assessed for radiation and contamination of equipment and areas for radiological workers and their safety.

      Worked closely with a variety of workers and managers in the nuclear industry; not only to protect them, but also the environment and production equipment.

      Surveyed equipment and work areas to obtain proper posting, labeling and tagging of radiological equipment and areas.

      Worked to ensure compliance with Nuclear Regulatory Commission and plant procedures.

      Held DOE QClearance.

      Educated workers of how to read postings and labels, and about radiation and contamination protection.

Education

shawnee state university PORTSMOUTH, oh

Associates Degree Humanities/Fine Arts, 1988

shawnee state university portsmouth, oh

Associates Degree Mathematics/Science, 1988

Page | 1



Experience

BACK TO TOP

 

Job Title

Company

Experience

Senior Project Controls Specialist

G.D. Barri & Associates

- Present

 

Additional Info

BACK TO TOP

 

Current Career Level:

Experienced (Non-Manager)

Years of relevant work experience:

10+ to 15 Years

Date of Availability:

Within one month

Work Status:

US - I am authorized to work in this country for any employer.

Active Security Clearance:

None

US Military Service:

Citizenship:

US citizen

 

 

Target Job:

Target Job Title:

Senior Project Controls Specialist

Desired Job Type:

Temporary/Contract/Project

Desired Status:

Full-Time
Per Diem

 

Target Company:

Company Size:

Occupation:

Engineering

·         Energy/Nuclear Engineering

Other

·         Other

Manufacturing/Production/Operations

·         Production/Operations Planning

Project/Program Management

·         Program Management

 

Target Locations:

Selected Locations:

US-OH-Cincinnati
US-OH-Columbus/Zanesville

Relocate:

Yes

 

Languages:

Languages

Proficiency Level

English

Fluent